Dikchu Hydro-electric Project with Over 3 hour storage capacity in Skkim (96 MW: Scope includes EPC Contract package Civil, HM and E&M works. The project is one of the states of art Hydro Projects in India with over 3 hours of storage capacity. The project commissioned on 31st March 2017 in a record time.


Salient Features of Dam & Tunnel



  • Height of Dam : 44.0 m from DFL
  • Length of Dam : 196.0 m
  • Type of Gates : Radial & Stop – Log
  • Vertical Gates : 7 Nos
  • Radial Gates: 4 Nos. (6.0 m x 8.0 m)
  • Overflow blocks : 2 Nos.
  • Non overflow blocks : 3 Nos.




  • Type of Tunnel : ā€œDā€ shaped
  • HRT : 5500 meters X 5.5 meters
  • Intake : 390 meters X 5.5 meters
  • SFT : 479.00 meters X 3.8 meters
  • Desilting Chamber : 140m x 12mx15.5m
  • No of Gate Shaft : 2 Nos.
  • Length of Shaft : 65 m & Dia 10.50 m
  • Under Ground Vertical Pressure Shaft : 335 , L x 3.0 Circular Steel Liner
  • Power House : 63 m x 18 m x 43 m