Construction of Sangareddy canal system Reach-I from Km. 3.700 at Gouraram (V), Wargal (M), Siddipet (D) to Km. 37.00 at Jeedipalli(V), Manoharabad (M), Medak (D) under Konda Pochamma Sagar, Siddipet District.