Desing Engineering, Procurement, Construction and Post Commissioning, Operation And Maintenance for 5 Year of 10 MW Grid Connected Small Hydro Electric Project at Mandira Dam, Near Rourkela, Sundergarh Dist. Odisha
Salient Features of Dam & Tunnel

- Intake Structure : 26.5 Cusec in 2 nos of Vents.
- Gate Type : Vertical Lift roller gates with rope drum hoist.
- Approach Channel Lenth : 73.00 m
- Approach Channel Width : 9.7 m (rectangular)
- Water conducting system size : 6 x 4.5 m
- Penstock : 3 Nos 2.8 m Dia
- Penstock Lenth : 47.68 m (Horizontal)
- Penstock type : MS Buried
- Powerhouse : Surface PH 28.9 x 32.25 m
- Turbines : 2 Nos 14.90 Cum./ Sec.
- Powerhouse Capacity: 10 MW (3.33 x 3)
- TRC 130.16 m
- Swith Yard 33 kV, 10 MW (45 x 52 m)