Execution of Civil and Hydro-Mechanical Works on EPC Basis, along with complete detailed engineering for the project, Scope of work will include all Civil and H&M components of project i.e. Upper embankment dam, Lower embankment dam (to be included), bottom outlet at upper reservoir, Intake Structure, Intake Tunnel along with Steel Liner, Penstocks, vertical and horizontal Pressure Shaft along with Steel Liner, Surface Powerhouse, Tail Race Tunnel, Outlet structure, Tail race channel, Adits, Hydro-Mechanical Works (including Gates, Stoplogs, hoisting arrangements, Trash Racks & valves etc), all other Appurtenant Works required for completion of project, Infrastructure works along with review & interface of Electro-Mechanical Works, Fabrication, Erection, Testing, Commissioning and conducting Performance Guarantee Testing complete and handing over in all respects of “Civil and Hydro-Mechanical Works” on “EPC BASIS”, remedying of the defects if any, and other activities incidental to the completion of Works.
for Integrated Renewable Energy Project (IREP) - 1260 MW Pumped Storage Project (PSP) at Saundatti, Belagavi, Karnataka, India.