60 MW wind farm at Animala Village, YSR Kadapa District, Andhra Pradesh on Engineering, Procurement and Construction basis (EPC)
c. Procurement, Manufacture, Testing & Inspection, Supply, Freight, Insurance, Loading for the (1) Material for 33/220 KV Pooling Substation, (2) 220 kV Overhead Line, (3) 33 KV line material (4) 33Kv Unit Substation equipment.
d. Civil Works for Pooling Substation (2) Foundation Works for 220 KV Line, (3) Foundation Works for 33 kV Unit Substations.
e. Erection, Testing, Commissioning, Internal Material Handling within site for (1) 220 KV Pooling Substation, (2) 12.50 km long 220 KV Line, (3) 33 KV Line and (4) 33 KV Unit Substations.